1997 Report

1998 Report

2001 Report

2002 Report

2003 Report

2004 Report

2005 Report

2006 Report

2007 Report

2007 Trail Maintenance Report

Sun. Dec. 7

3 hours

Stinky Girl / Frankenstein – 3 fallen trees saw-cut and removed

 

Sat. Nov. 29

3 hours

Creepy Corner / Bootleg Trail / Monkey Boy / Scrambler / Jake’s Attack / Jake’s Breakaway / Twister - Deadfall removed from the trails

 

Sun. Nov. 23

4 hours

The Pines – Saw-cut and removed the numerous larger deadfall

2 x 4 hours

Rockin’ Ronnie - Saw-cut and removed a large fallen tree
The Landfill trail – Mapped all the emergency exits along the fence

 

Sat. Nov. 22

3 x 2 hours

All the trails – Deadfall removed from the trails

 

Sun. Nov 2

5 hours

The Pines – Wet spots repaired

 

Sat. Oct. 25

2 x 9 hours

Scrambler (the beginning) – The two way section eliminated by rerouting the trail

 

Thu. Oct. 23

1 hour

Rocky Mountain (at the canal bridge) – Rock armouring repaired by adding more rocks to it

 

Sat. Oct. 18

23 x 4 hours

Rockin’ Ronnie / Kaitlyn’s Switchbacks / Stinky Girl / Frankenstein / Double Bypass / Andy’s BBQ Run – Wet spots repaired with rocks, gravel, corduroy logs, and water shedding nicks
Rocky Mountain (at the canal bridge) – A shortcut blocked away with large logs

2 hours

BBQ lunch prepared for the volunteers

 

Sun. Oct. 12
5 hours

Jake’s Attack – Changed the line of the big U-Turn at the bottom of the trail
Jake’s Attack – Made a large rock inslope after the big U-Turn
Monkey Boy – The recently changed line moved slightly for better flow

 

Sat. Oct. 11
3 hours

Rocky Mountain – The big rock pile extended over a big water collecting depression

 

Thu. Oct. 2
3 hours

Monkey Boy – Water shedding nick created
Scrambler – Mud hole repaired with rock and a nick made bigger

 

Sun. Sep. 28
4 hours

Bride (near the end) – Big mud hole behind the tree armoured with large rocks and drainage ditch created

 

Sat. Sep. 27
5.5 hours

Sweet Street – Earlier failed repair rerouted and 4 spots armoured with rocks
Jake’s Attack – Earlier failed repair rerouted to a dryer ground
Jake’s Attack – Reroute made around roots and mud holes
Jake’s Attack – 2 sections armoured with rocks

 

Tue. Sep 16
2 hours

Adam’s Run / Sweet Street – deadfall saw cut and removed

 

Mon. Sep. 15
3 hours

All West end trails except Adam’s Run and Sweet Street – Fallen trees and branches cleaned out of the way

 

Sun. Sep. 9
6.5 hours

Monkey Boy – Fallen tree saw cut and removed
Monkey Boy – Mud hole repaired
Jake’s Breakaway – A passage through a big fallen log cut with a saw
Sweet Street – 2 large water shedding nicks made
Sweet Street – Old rock repair improved
Sweet Street – Corduroy-log repair made over a mud hole
Sweet Street – Banked corduroy-log repair made in a muddy corner
Jessica – Mud hole in a corner repaired with rocks

 

Sat. Sep 8
3 hours

Monkey Boy – 3 Sections slightly rerouted to avoid mud
Jake’s Breakaway – 2 water shedding nick and 2 small reroutes made
Adam’s Run – Water shedding nick made

 

Fri. Sep. 7
6 hours

Bootleg Trail / Monkey Boy intersection – Narrowed down with logs
Monkey Boy – Earlier rock repair improved with more rocks
Monkey Boy – Section rerouted for better flow and mud avoidance
Monkey Boy – Earlier reroute changed because it didn’t workout properly
Jake’s Breakaway – Section slightly rerouted around mud
Jake’s Breakaway – 3 mud holes repaired with rocks
Kamikaze – Mud hole repaired with rocks

 

Wed. Sep. 5
6 hours

Bootleg Trail – Ruts eliminated
Bootleg Trail – Slight reroutes made around mud
Adam’s Run – 4 water shedding nick made
Adam’s Run – Mud hole repaired with logs
Adam’s Run – 2 mud holes fixed with rocks
Sweet Street (beginning) – Trail slightly rerouted around mud, and for better flow
Sweet Street – Mud hole fixed with large rocks
Sweet Street – Numerous wet spots fixed with rocks or water shedding nicks
Sweet Street – Big log moved out of the way to allow better drainage
Twister – 2 wet spots repaired with nicks

 

Tue. Sep. 4
6 hours

Scrambler – Mud holes repaired with rocks and/or water shedding nicks
Scrambler – 2 log piles built over mud holes
Jakes Attack / Sweets Street – Repairs done
Jessica – 3 Water shedding nicks made

 

Sat.  Aug. 30

12 x 4.5 hours

Stinky Girl (near the middle at the cutout the big fallen log) – Mud hole lined with cloth and filled with 8 wheel-barrel loads of gravel
Stinky Girl (after the boardwalk) – Old corduroy log section extended
Bride – The wet depression at the end of the big descent lined with big rocks
Bride (before the bridge with railings) – Rerouted around a muddy section

2 hours

Glasgow Parking – Barbecue lunch prepared for the volunteers

3 hours

Monkey Boy – Mud hole filled with rocks
Monkey Boy – Trail rerouted around muddy sections

 

Sun. Aug. 24

3 hours

Creepy Corner / Bootleg Trail / Adam's Run / Jake's Breakaway / Twister – Fallen or low hanging trees and branches cut, exposed roots, loose stones and sticks removed

 

Sat. Aug. 23

7 x7 hours

Rockin’ Ronnie / Andy’s BBQ Run – Wet spots and mud holes repaired with: rock, gravel, and/or dirt filling, stone armouring, corduroy logs, culverts, and cutting drainage knicks.

Andy’s BBQ Run – Swampy section crossing spanned with a big flat log

 

Sun. Aug. 17

2 x 3 hours

Rockin’ Ronnie (near the beginning) – Wet and muddy areas filled with many wheel barrel loads of gravel

 

Sat. Aug. 16

2 x 3 hours

Andy’s BBQ Run – Fallen tree saw-cut and removed
Rockin’ Ronnie (beginning) – Wet and muddy area filled with many wheel barrel loads of gravel

 

Mon. June 23

2 x 4 hours

Andy’s BBQ Run – The wet area rerouted and the low spots filled with dozens of wheel-barrel loads of crushed stone

 

Wed. June 11

3 hours

The Pines – Saw-cut and cleared the deadfall

8 x 3 hours

The Landfill Trails – Large number of storm fallen trees saw-cut and removed from the trails

 

Sat. June 7

2 hours

The Pines – Corrected the trail difficulty marking errors on the signs

 

Fri. May 30

4 x 1.5 hours

Jakes Breakaway – Big fallen tree saw cut and removed

 

Wed. May 28

2 x 4 hours

Stinky Girl - The trail change finished with bench cutting the last section before the little bridge.

3 x 1 hour

Stinky Girl – Roots cut out from the new change backward to the second big log pile

3 x .5 hours

Glasgow Parking - Metal post and sign placed on the trailhead to indicate the correct way for cyclist

 

Mon. May 26

1 hour

Stinky Girl – More bench cutting done near the end of the latest trail change

2 x 5 hours

Stinky Girl – The new footing for the bridge made out of large rocks
Stinky Girl – The trail change finished and opened by rotating the little bridge to new position
Stinky Girl – The trail after the bridge changed for correct run-out and blending in to the old trail
Stinky Girl – The beginning of the change finalized with proper bench cutting

 

Sun. May 25

2 x 9 hours

Stinky Girl (at the gully) – Worked on the trail change, mainly bench cutting the trail along the gully

2 x 3 hours

Stinky Girl (at the gully) – Helped with bench cutting

 

Thu. May 22

3 x 5.5 hours

Stinky Girl – The descent in to the gravity drop cleared from small rocks and then covered with a smooth layer of soil
Stinky Girl – First half of the trail cleared from brush and bench cut where needed

 

Mon.  May 19

2 hours

Bypass / Double Bypass – Roots removed

2 x 4 hours

Glasgow Street Entrance – Snow fences repaired and repositioned to help guide the cycling traffic towards the new gate
Glasgow Street Entrance – Signs repositioned to help guide the cycling traffic through the new gate
Glasgow Street Entrance – Better trail layout planned
Stinky Girl  – Trail change planned and marked out

8 hours

Stinky Girl – Part of the new layout cleared from brush, raked and bench cut
Stinky Girl – The bottom of the big gravity drop paved with large stones

 

Sat. May 17

12 x 4 hours

Creepy Corner (beginning) – Trail rerouted
Adam’s Run (middle section) – The old straight rooted section rerouted
Twister (near the end) – A hairpin corner changed for better flow

2 hours

Snyder’s parking – BBQ Lunch prepared for the volunteers

 

Mon. May 12

2 x 2 hours

Creepy Corner – Big log saw cut and removed from the new to be open section
Creepy Corner – Big log pile built on the new to be open section
Double Track – Two fallen trees saw cut and removed from the trail

 

Sat. May 10

4 hours

Creepy Corner – The trail change cleared from brush

 

Fri. May 9

4 hours

Creepy Corner – Trail change marked out
Adam’s Run – Trail Change marked out and the brush cleaned from it

 

Mon. May 5

3 hours

Rockin’ Ronnie, Kaitlyn’s Switchbacks, Stinky Girl (first section) – All smaller exposed roots removed

 

Sun. May 4

3 hours

The Bride – Holes filled with soil

5 hours

Andy’s BBQ Run – Culvert placed at the open swampy area with lot of water flow over the trail
Rockin’ Ronnie – Muddy spot reinforced with rocks and gravel

1 hour

Kamikaze – Fallen trees saw cut and removed from the trail

 

Sat. May 3

2 x 2 hours

Glasgow Street Entrance – 10 “No Cycling” signs installed along the Hydro’s gravel access road

 

Mon. Apr. 21

3 hours

Andy’s BBQ Run – Built a log pile over a fallen tree
Back 40 (end) – Smoothed out the ruts and bumps on the switchback descent
Rocky Mountain – Closed down a shortcut
Rocky Mountain (the beginning) – Narrowed down the trail with logs and rocks

 

Sat. Apr. 19

2 x 2.5 hours

Andy’s BBQ Run – Finished spanning the swampy open field with a gravel path

 

Wed. Apr. 16

4 x 1/2 hours

The whole trail system – Deadfall removed

 

Mon. Apr. 14

4 hours

Stinky Girl – Repaired a new corner from the latest Trail Day
Bride (new section) – Big hole filled with soil
Bride (new section) – Flooded depression covered with corduroy log crossing
Frankenstein – A “No Fire” sign placed on a tree in the area where someone keeps making a campfire
Frankenstein – Cleaned out the culvert underneath the big Wopty-Dooo

 

Sat. Apr. 12

18 x 4 hours

Stinky Girl – Rerouted the section near and over the former hydro corridor
Stinky Girl – The former hydro corridor fenced off with a snow fence
Andy’s BBQ Run – The swampy part through the open field covered with gravel

3 x 3 hours

Glasgow Parking – King Street Cycles barbecue prepared for the volunteers

2 hours

Twister / Sweet Street – Deadfall trees removed

 

Wed. Apr. 9

2 hours

Twister / Scrambler – Deadfall removed

2 hours
Stinky Girl – Preparations made for the upcoming trail day

 

Sun. Apr. 6

2 x 2 hours

Stinky Girl – One old sign and pole removed and two new signs and poles installed because of the trail changes to be done

 

Sun. Mar. 16

2 hours

Creepy Corner, Bootleg Trail, Adam's Run, second half of Jessica – Deadfall saw-cut and removed

 

Sat. Jan. 12

10 x 3.5 hours

The Bride – Most of the trail changed for better flow and sustainability

3 x 4 hours

The Bride – The changes touched up and one bend insloped and shaped with big rocks

 

Sun. Jan. 6

2 x 4 hours

Rockin' Ronnie / Stinky Girl / Bride / Andy's BBQ Run – Trails cleaned with a snow-blower